Thursday, June 13, 2013

Tempe High School

Tempe High School needed a new look to their gym floor. They choose Arizona Gym Floors to stain their three point areas.



Thursday, February 14, 2013

WATER DAMAGED FLOORS ARE A SPECIALITY OF ARIZONA GYM FLOORS


Tucson United School District choose Arizona Gym Floors to adhere to their demanding schedule to install a new gym floor to replace the water damaged 50 year existing gym floor at the Rincon High School. The floor was damaged by a leaking drinking fountain and needed replacement. Because the gym was initially was installed with a SAND leveler under the floor, the concrete slab was so out of level the best economical solution was to install Aacer's Scissor-Loc floor system, with the 3/4" foam option. The Scissor-Loc floor system, is the only wood floor that has been flooded twice and is still in use today. If you need an NEW or replacement floor please let us know so we can show you the advanteges of the Scissor-Loc gym floor system.
 http://aacerflooring.com/reparing-water-damaged-floors-are-a-speciality-of-arizona-gym-floors/